ProjectID Project Name Project Type Current Phase Council District Neighborhood Current Budget Start End Scope of Work
DPW381 ADA Access Ramps in CBD CDBG Funded Construction B Central Business District $380,940.60 10-Nov-14 A Q1 2015 Installation of new ADA compliant  ramps in the CBD.
DPW438 Alabo St. (Chartres - Port) CDBG Funded Complete E Holy Cross $366,666.67 18-Aug-14 A 29-Sep-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW003 Alcee Fortier Blvd Streetscape (Chef Menteur Hwy - Michoud Lagoon) CDBG Funded Complete E Village de Lest $600,000.00 15-Aug-13 A 30-Apr-14 A May include sidewalk or other pedestrian walkway improvements,  bikeways, traffic and pedestrian signage or signalization, landscaping,  lighting, or public art.
DPW004 Algiers (Traffic Signal) City Funded Complete C Algiers Point/McDonough/Behrman $3,991,109.00 02-Apr-12 A 21-Nov-13 A Traffic signal improvements
DPW343 Alvar St. (Chef Menteur - Higgins) PTP Complete D Desire Area $677,527.00 09-Jul-12 A 01-Nov-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW342 Alvar St. (Higgins - Florida) PTP Complete D Desire Dev $677,527.00 09-Jul-12 A 01-Nov-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW287 Arise Academy - Safe Routes to School (K08-572) State ID 737-99-1024 City Funded Bid & Award CD Bywater $343,334.00 Q1 2015 Q2 2015 Construct curb extensions with ADA compliant ramps at 16  locations, countdown pedestrian signals at 6 locations, pavement markings for  crosswalks at 16 locations, and miscellaneous markings and signs all in the  immediate vicinity of the Dr. Charles R. Drew Elementary School.  State  Project No. 737-36-0015 and Federal Project No. SRS-3608 (504).
DPW449 Aubry St. (Broad - Gentilly) CDBG Funded Planning D Seventh Ward $1,922,100.00 Q1 2016 Q4 2016 This project will perform roadway improvements on Aubry  Street from North Broad to Gentilly Boulevard.  The project scope of  work  will be to remove the existing asphalt overlay and roadway base and  replace with concrete pavement including panel installation, new base and  sub-base, sealing of joints, curb repair, reconstruction/adjustment to existing  catch basins and manholes, and new instillation of catch basins and  manholes.  This project will also install new subsurface utilities  including drain lines, sewer, and water lines.  Additional improvements may  include features to improve access for all users such as sidewalk repair, construction of ADA ramps,  installation of high-visibility crosswalk and other roadway striping, and  installation of new way finding and other street  signage.
DPW009 Audubon Blvd. (Willow St - S. Claiborne Ave) City Funded Complete A Audubon $6,177,231.00 18-Oct-10 A 26-Jun-12 A Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW363 Banks St. (Carrollton - St. Patrick) PTP Complete A Mid-City $829,492.00 06-Nov-13 A 12-Mar-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW384 Baronne St. (Canal St - Calliope St.) PTP Complete B Central Business District $1,392,336.00 24-Mar-14 A 17-Oct-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW354 Basin St. (Canal - N. Claiborne) PTP Complete C Treme - Lafitte $1,878,613.00 22-Nov-13 A 03-Dec-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW010 Bayou Rd Streetscape (Broad St - Rocheblave St) CDBG Funded Construction D Seventh Ward $875,000.00 07-May-14 A Q1 2015 May include sidewalk or other pedestrian walkway improvements,  bikeways, traffic and pedestrian signage or signalization, landscaping,  lighting, or public art.
DPW011 Berkley Dr (Huntlee Canal - Woodland Dr) City Funded Complete C Old Aurora $6,646,591.00 14-Feb-11 A 15-Mar-12 A Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW012 Berkley Dr (Kabel Dr - Huntlee Dr), Somerset Dr (Berkley Dr - MacArthur Blvd) City Funded Construction C Old Aurora $7,828,734.00 19-Jan-15 A Q4 2015 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW364 Bienville St. (Jefferson Davis - Carrollton) PTP Complete AB Mid-City $518,478.00 06-Nov-13 A 28-Feb-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW048 Bike Rack Installation Project City Funded Design ABCDE Central Business District $448,418.00 Q1 2016 Q1 2016 Installation of bike racks in various  locations.
DPW313 Broad and Washington Streetscape (S. Broad (Fourth - Louisiana) Washington (S. White - Dorgenois) CDBG Funded Complete B Broadmoor $407,593.16 10-Mar-14 A 18-Jul-14 A May include sidewalk or other pedestrian walkway  improvements, bikeways, traffic and pedestrian signage or signalization,  landscaping, lighting, or public art.
DPW014 Broad St. and Lafitte St Streetscape (Bienville St - Orleans Ave) CDBG Funded Bid & Award AB Tulane - Gravier $713,315.00 Q1 2015 Q2 2015 May include sidewalk or other  pedestrian walkway improvements, bikeways, traffic and pedestrian signage or  signalization, landscaping, lighting, or public art.
DPW016 Broadmoor Streetscape (General Pershing from Broad St. to Miro St.) CDBG Funded Complete B Broadmoor $381,439.00 23-Aug-12 A 05-Feb-13 A May include sidewalk or other  pedestrian walkway improvements, bikeways, traffic and pedestrian signage or  signalization, landscaping, lighting, or public art.
DPW361 Broadway St. (Fontainbleau - Leake) PTP Complete AB Audubon $3,074,065.00 17-Apr-13 A 22-Aug-13 A Removal  and replacement of the sidewalk intersections for the installation of the  compliant ADA ramps and the installation of the ADA ramps in the  medians.
DPW417 Burdette St. (Oleander - Forshey) CDBG Funded Complete A Gert Town $31,262.50 11-Aug-14 A 13-Sep-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW367 Burgundy St. (Canal - Esplanade) PTP Complete C French Quarter $1,382,353.00 16-Jul-12 A 31-Dec-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW385 Burgundy St. (Esplanade - Elysian Fields) PTP Complete C Marigny & Bywater Neighborhoods $880,000.00 24-Mar-14 A 17-Oct-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW440 Caffin (Chartres - St. Claude Ave.) CDBG Funded Construction E Holy Cross $366,666.67 Q1 2015 Q2 2015 Rehabilitation of asphalt pavement including mill, patching, and 2-inch    overlay. Additional improvements include sidewalk repair, construction of ADA    ramps, installation of high-visibility crosswalks, and other roadway    striping.
DPW018 Camp (Valmont - Jefferson), Chestnut/Coliseum (Valmont - Leontine), Leontine/Valmont (Mag-Prytania) City Funded Design B Uptown $9,721,674.00 Q4 2015 Q1 2016 Reconstruction of existing roadway, including the replacement of affected  utilities.
DPW019 Camp St. (Canal - US 90) PTP Complete B Central Business District $1,274,264.00 03-Nov-09 A 04-Dec-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of trees, ADA  ramps and bike lane signage & striping.
DPW199 Camp St. (Toledano - Washington Ave) City Funded Design B Touro $3,173,746.00 Q4 2015 Q2 2016 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW020 Canal Blvd. Reconstruction (Robert E. Lee Blvd - Amethyst St.) City Funded Design D Lakeshore-LakeVista $9,611,385.00 Q3 2016 Q3 2017 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW023 Carondelet St. (Canal St - US 90) PTP Complete B Central Business District $941,878.00 03-Nov-09 A 04-Dec-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable,installation of ADA  ramps.
DPW024 Carrollton Ave  (St. Charles - Claiborne US 90) PTP Complete A Mid-City $3,439,548.00 11-Jan-10 A 14-Jul-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, removal & replacement of  sidewalks, installation of trees, ADA ramps and bikelane striping &  signage.
DPW027 Carrollton Ave & Palmetto / Washington Streetscapes CDBG Funded Complete AB Gert Town $500,000.00 28-May-13 A 24-Jan-14 A An enhancement project that may include: New road striping, improved curbs,  gutters and sidewalks, improvements to drainage and catch basins, installation  of new landscaping and streetlights.
DPW025 Carrollton Ave (South) (I-10 - Claiborne US 90) PTP Complete AB Mid-City $3,520,481.00 11-Jan-10 A 14-Jul-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, renewal & replacement of  sidewalks, installation of ADA ramps.
DPW234 Carrollton Intersection (S. Carrollton Ave. from I-10 - Palm St.) CDBG Funded Complete AB Gert Town $1,500,000.00 28-May-13 A 24-Jan-14 A Traffic signal and roadway intersection improvements
DPW029 Cartier Ave  (Mirabeau Ave - Filmore Ave) City Funded Construction D Filmore $3,242,232.00 12-Jan-15 A Q4 2015 Reconstruction of existing roadway,  including the replacement of affected utilities.
PWF074 Catchbasin/Manhole Repair City Funded Complete ABCDE City Wide $6,891,414.00 30-Jun-08 A 08-Aug-10 A Repair of catchbasins and manholes damaged as a direct result of  post-Hurricane Katrina clean-up efforts.
DPW030 Catina (Mouton - Robert E Lee), Louisville (Filmore - Robert E Lee) City Funded Complete A Lakeview $5,339,372.00 22-Mar-10 A 10-Jan-11 A Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW439 Chartres (Alabo - Caffin) CDBG Funded Construction E Holy Cross $366,666.67 Q1 2015 Q2 2015 Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW457 Cherokee Phase II (Benjamin St. - Pearl St.) City Funded Design A Black Pearl $436,914.23 Q1 2016 Q2 2016 Installing a new  subsurface storm water collection and conveyance system in a two block region of  Cherokee street for approximately 700 linear feet.
DPW034 Cherokee St (Hampson St - Freret St) City Funded Construction A East Carrollton $1,815,931.00 10-Nov-14 A Q1 2015 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW365 City Park Ave. (Canal - Orleans) PTP Complete A Mid-City $1,244,264.00 04-Mar-13 A 24-Jun-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW036 City Park Tad Gormley Parking Lots (Marconi - Stadium Dr.) City Funded Design A City Park $930,660.00 Q2 2015 Q4 2015 New parking area at Tad Gormley Stadium and expand parking area at Marconi  Drive.
DPW178 Claiborne (South) @ Toledano (Napoleon Ave - Martin  Luther King  Jr.) CDBG Funded Complete B Central City $2,174,840.00 16-May-12 A 04-Dec-13 A An enhancement project that may include: A new memorial commemorationg the  contributions of nine New Orleans Civil Rights Leaders, palm tree lined walkways  from Jackson Ave to Josephine St, Lighting and landscaping in the median from  Napoleon Ave to Jackson Ave, new streetlights complete with fixtures on which to  hang decorative banners.
DPW089 Claiborne Avenue Streetscape (Cleveland St. - Gravier St.) City Funded Complete B Central Business District $2,508,055.00 04-Jan-10 A 17-Sep-10 A Sidewalk and landscaping  improvements
DPW041 Common St. (Loyola Ave - S. Peters St) PTP Complete B Central Business District $1,236,691.00 03-Nov-09 A 04-Dec-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, removal & replacement of  sidewalks, installation of trees, ADA ramps, bikelane signage &  striping
DPW377 Congress St. (Hayne - Madrid) PTP Complete D Pontchartrain Park $487,964.00 06-Jan-14 A 16-Jul-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW378 Congress St. (Madrid - Chef Menteur) PTP Complete D Pontchartrain Park and Gentilly Woods $1,476,057.00 06-Jan-14 A 16-Jul-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW454 Constance St. (Jackson - Phillip) CDBG Funded Planning B Lower Garden District $150,000.00 Q1 2015 Q2 2015 This project will accomplish the rehabilitation of  asphalt pavement including, milling, full depth patching and 2-inch overlay,  clearing and sealing of joints and curb repair.  Additional improvements  may include features to improve access for all users such as sidewalk repair,  construction of ADA ramps, installation of high-visibility crosswalks and other  roadway striping, and installation of new way finding and other street                             signage.
DPW382 CostCo Infrastructure Improvements CDBG Funded Complete AB Gert Town $2,102,320.00 29-Apr-13 A 03-Oct-13 A An enhancement project that may include: Demolition of existing frontage  roads, installation of road grading, new road striping, improved curbs,  gutters and sidewalks, improvements to drainage and catch basins,   construction of a deceleration lane on Palmetto St, warning beacons at  the Pontchartrain Expressway exit from I-10, new traffic signal at Dixon St and  Dublin St., and installation of new landscaping and  streetlights.
DPW285 Countdown Timers - Downtown City Funded Design B Central Business District $1,319,146.00 Q2 2015 Q4 2015 Retrofit existing traditional  walk/stop pedestrian signals with countdown timers and adding new pedestrian  countdown signals in the Downtown area.
DPW250 Crowder Blvd (Dwyer Rd - US 90) Bikeway City Funded Complete E Read Blvd West $9,600.00 08-Dec-09 A 01-Jul-10 A Install new pavement markings and  signage
DPW368 Dauphine St. (Canal - Esplanade) PTP Complete C French Quarter $1,322,195.00 16-Jul-12 A 31-Dec-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW420 De Armas (Hendee - Behrman) CDBG Funded Complete C Whitney $700,655.85 08-Sep-14 A 03-Oct-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW372 Decatur St. (St Louis - Dumaine) PTP Complete C French Quarter $599,038.00 23-Jul-12 A 31-Dec-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW045 DeSaix Bridge over Bayou St. John City Funded Planning AD City Park $1,242,708.00 #N/A #N/A Bridge reconstruction
DPW403 Downman Rd (Babylon - Odin) PTP Complete D Pines Village $412,500.00 16-Jun-14 A 29-Sep-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW392 Downtown Infrastructure Improvements (Dorsiere, Iberville, Julia St) City Funded Construction BC Central Business District $6,500,000.00 24-Jul-13 A Q1 2015 The scope of work in the French Quarter includes resurfacing Dorsiere St.  from Iberville to Canal streets, and Iberville St. from North Peters to North  Rampart streets with concrete. These additional infrastructure improvements will  include new Americans with Disabilities Act-compliant curb ramps, repairs to  damaged sidewalks and driveway aprons, drainage point repairs, new striping and  crosswalks, repairs to damaged street lights including conversion of  non-historic streetlights to LED lights, signage improvements, and improved  sanitation practices.   The scope of work in the CBD includes resurfacing Julia St. from Convention  Center Blvd. to Loyola Ave. with concrete. These additional infrastructure  improvements will include new sidewalks and driveway aprons, Americans with  Disabilities Act-compliant curb ramps, drainage point repairs, new striping and  crosswalks, signage improvements, and improved sanitation practices.
DPW321 Drain Point Repair Services City Funded Complete ABCDE City Wide $6,016,300.00 22-Feb-10 A 01-Oct-11 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
DPW293 Drainage Master Plan Study CDBG Funded Complete ABCDE City Wide $2,000,000.00 #N/A 30-Apr-12 A Conduct field investigations and survey of major drainage  facilities.  Review and update existing Geographic Information System (GIS)  data.  Review and assess current data management, develop model for  new system.  Develop standards and guidelines, and maintenance  procedures.
DPW411 Drexel (Short - S. Genois) CDBG Funded Complete A Gert Town $232,300.75 27-Jun-14 A 25-Jul-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW050 Earhart Blvd Segment I (Hamilton St - Fern St) City Funded Complete AB Gert Town $12,732,296.00 30-Nov-09 A 10-Oct-11 A Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW329 Edgelake Court (Crowder Rd - Hayne Blvd) City Funded Complete E Little Woods $338,900.00 08-Apr-13 A 29-May-13 A Asphalt pavement, base repair and  curb replacement.
DPW421 Elmira (Park - Diana) CDBG Funded Complete C McDonogh $700,655.85 08-Sep-14 A 06-Oct-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW052 Elysian Fields (Lakeshore Dr. - Gentilly Blvd. / US 90) PTP Complete D Gentilly $1,597,583.00 20-Nov-09 A 12-Apr-12 A Rehabilitation of roadway by milling existing surface and overlay with new  asphalt, including pre-milling patching repairs as well as adjustment of utility  manholes, where applicable, removal & replacement of concrete roadway from  Lakeshore Dr. - Robert E Lee Blvd, removal & replacement of sidewalk,  installation of ADA ramps, bike lane striping & signage.
DPW314 Esperanza Charter School - Safe Routes to School (K09-886)  State ID 737-99-1024 City Funded Bid & Award A Mid-City $304,956.00 Q1 2015 Q2 2015 Construct 16 curb extensions, sidewalk repair, 2 bike  racks, pavement markings, countdown pedestrian signals and signs near the  Esperanza Charter School.  State Project No. 737-36-0022 and Federal  Project No. SRS-3609 (509).
DPW396 Esplanade Ave (Claiborne - N.Rampart) Bikeway City Funded Complete CD Treme - Lafitte $13,000.00 22-Aug-13 A 16-Jan-14 A Install new pavement markings and  signage
DPW366 Esplanade Ave. (Moss - N. Claiborne) PTP Complete CD Treme - Lafitte $3,019,171.00 04-Mar-13 A 24-Jun-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW369 Esplanade Ave. (N Rampart - N Peters) PTP Complete C French Quarter $1,602,028.00 16-Jul-12 A 31-Dec-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW055 Filmore Ave (Bayou St. John - Elysian Fields Ave) City Funded Complete D Filmore $2,743,221.00 20-Nov-09 A 31-May-11 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, removal & replacement of  sidewalk, installation of ADA ramps, bike lane striping &  signage.
DPW352 Filmore Ave. (Marconi - Wisner) PTP Complete A City Park $512,344.00 17-Jun-13 A 19-Sep-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW351 Filmore Ave. (West End - Canal) PTP Complete A Lakeview $512,344.00 17-Jun-13 A 19-Sep-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW056 Filmore Bridge over Bayou St. John City Funded Planning AD City Park $1,050,000.00 #N/A #N/A Bridge  reconstruction
DPW058 Fleur de Lis Phase II (Veterans Blvd - Harrison Ave) City Funded Complete A West End $11,976,162.00 10-Dec-09 A 04-Mar-11 A Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW059 Fleur de Lis Phase III (30th - Hammond Hwy) City Funded Design A West End $16,762,886.00 Q1 2016 Q3 2016 Reconstruction of existing roadway, including the replacement of affected  utilities.
DPW359 Fontainebleau Dr. (Broadway - Nashville) PTP Complete AB Marlyville & Fontainbleau $439,152.00 23-Aug-13 A 06-Nov-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW413 Forshey (S. Carrollton Ave. - Fern) CDBG Funded Complete A Gert Town $55,376.25 25-Aug-14 A 15-Sep-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW340 Forstall St. (Douglass St. - N. Claiborne) PTP Complete E Lower Ninth Ward $677,527.00 09-Jul-12 A 01-Nov-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW266 Franklin Ave. ( I-610 - LA 46) Bikeway City Funded Design CD St. Claude $24,000.00 Q2 2016 Q2 2016 Install  new pavement markings and signage
DPW350 Franklin Ave. (Filmore - Gentilly) PTP Complete D Gentilly Terrace $1,451,625.00 17-Jun-13 A 19-Sep-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW063 Freret St Streetscape (Napoleon Ave  - Jefferson Ave) CDBG Funded Complete B Freret $1,000,000.00 04-Nov-13 A 12-Mar-14 A May include sidewalk or other  pedestrian walkway improvements, bikeways, traffic and pedestrian signage or  signalization, landscaping, lighting, or public art.
DPW357 Freret St. (Louisiana - Jefferson) PTP Complete B Freret $1,375,469.00 23-Aug-13 A 06-Nov-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW278 Galvez ( Elysian Fields - Orleans Ave ) Bikeway City Funded Construction D Treme - Lafitte $24,000.00 11-Jul-14 A Q1 2015 Install new pavement markings and  signage
DPW066 Galvez (Poydras - Orleans Ave.) PTP Complete ACD Mid-City $808,999.00 27-Feb-10 A 30-Jun-11 A Rehabilitation of roadway by milling  existing surface and overlay with new asphalt, including pre-milling patching  repairs as well as adjustment of utility manholes, where applicable.
DPW068 Gardena Dr (St. Bernard Ave - Paris Ave.) City Funded Planning D Filmore $4,639,850.00 Q2 2016 Q3 2016 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW389 General DeGaulle Dr (Woodland - Holiday) PTP Complete C Old Aurora $1,508,000.00 18-Aug-14 A 05-Dec-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW054 General Meyer Ave Streetscape (Hendee St - Odeon Ave) CDBG Funded Design C Behrman $584,906.00 Q3 2015 Q2 2016 May include sidewalk or other  pedestrian walkway improvements, bikeways, traffic and pedestrian signage or  signalization, landscaping, lighting, or public art.
DPW349 Gentilly Blvd. (Paris - Broad) PTP Complete AD Fairgrounds $2,415,337.00 01-Jun-13 A 17-Oct-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW070 Gentilly Minor Streets - Caton (Gentilly Blvd. - Norman Mayer Ave.), Touro (Caton - Senate) CDBG Funded Complete D Dillard $460,367.00 16-Sep-13 A 23-Jan-14 A Improvements to various  minor streets, which may include reconstruction and/or milling and overlay.
DPW071 Gentilly Streetscape (Caton, Gentilly, Elysian Fields) CDBG Funded Complete D Dillard $684,567.00 18-Nov-13 A 27-Jun-14 A May include sidewalk or other pedestrian walkway improvements, bikeways, traffic  and pedestrian signage or signalization, landscaping, lighting, or public art.
DPW429 Georgia St. (Amazon - Gen DeGaulle) CDBG Funded Complete C Tall Timbers - Brechtel $35,002.00 29-Jul-14 A 20-Aug-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW272 Girod St.  ( Loyola Ave - S. Peters St)  Bikeway City Funded Complete B Central Business District $14,000.00 22-Aug-13 A 22-Oct-13 A Install new pavement markings and  signage
DPW074 Girod St. (Loyola Ave - S. Peters St) PTP Complete B Central Business District $870,959.00 03-Nov-09 A 04-Dec-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of ADA  ramps.
DPW075 Gordon (Chartres - St. Claude), Flood (Peters - St. Claude) City Funded Complete E Lower Ninth Ward $6,254,075.00 01-Apr-11 A 01-Jun-12 A Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW076 Gravier St (Galvez - Broad) City Funded Bid & Award B Tulane - Gravier $3,340,788.00 Q2 2015 Q3 2015 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW077 Gravier St. (Loyola Ave - S. Peters St) PTP Complete B Central Business District $585,378.00 03-Nov-09 A 04-Dec-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of ADA  ramps.
DPW253 Harrison Ave ( West End Blvd- Orleans Canal) Bikeways City Funded Design A Lakeview $30,100.00 Q4 2015 Q4 2015 Install new pavement markings and  signage
DPW081 Harrison Ave Bridge over Bayou St. John (Eastbound) City Funded Complete AD City Park $709,610.00 06-Apr-10 A 03-Oct-11 A Bridge  reconstruction
DPW082 Harrison Ave Bridge over Bayou St. John (Westbound) City Funded Complete AD City Park $709,610.00 06-Apr-10 A 03-Oct-11 A Bridge reconstruction
DPW083 Harrison Ave Streetscape (Canal St - Orleans Ave) CDBG Funded Complete A Lakeview $3,554,499.00 18-Mar-13 A 12-Feb-14 A An enhancement project that may include: Additional trees and shrubbery, new  brick-paved sidewalks, additional lighting, fresh crosswalk markings, and  improved irrigation.
DPW344 Hayne Blvd. (Press - Congress) PTP Complete D Pontchartrain Park $480,958.00 16-Jul-12 A 01-Nov-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW424 Hendee (Mardi Gras - Ptolemy) CDBG Funded Complete C Whitney $91,525.60 13-Oct-14 A 07-Nov-14 A Rehabilitation of concrete pavement  including panel patching/replacements, clearing and sealing of joints, crack  sealing and curb repair. Additional improvements include sidewalk repair,  construction of ADA ramps, installation of high-visibility crosswalks and other  roadway striping.
DPW425 Hendee (Ptolemy - Opelousas) CDBG Funded Complete C Whitney $700,655.85 05-Aug-14 A 03-Sep-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW085 Holiday Dr  (General Meyer Ave - MacArthur) City Funded Complete C Old Aurora $3,186,173.00 01-Jun-11 A 07-Feb-12 A Rehabilitation of roadway by milling  existing surface and overlay with new asphalt, including pre-milling patching  repairs as well as adjustment of utility manholes, where applicable.
DPW086 Holiday Dr (MacArthur - Behrman) City Funded Complete C Old Aurora $2,732,303.00 15-Nov-11 A 16-Feb-12 A Rehabilitation of roadway by milling  existing surface and overlay with new asphalt, including pre-milling patching  repairs as well as adjustment of utility manholes, where applicable.
DPW245 Holy Cross Roadway Improvements - Douglass St., Andry St., N. Peters St. CDBG Funded Complete E Lower Ninth Ward $884,332.00 11-Jan-10 A 12-Oct-10 A Improvements to various  minor streets, which may include reconstruction and/or milling and overlay.
DPW087 Homedale (Canal - West End), Center (33rd - Tacoma), Milne (Homedale - Florida), Walker (Marshal-Orl City Funded Design A Lakeview $14,011,948.00 Q3 2015 Q2 2016 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW088 Howard Avenue Ext. (Loyola Ave  - LaSalle St) City Funded Design B Central Business District $6,762,202.00 Q3 2016 Q4 2016 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW243 Huntlee Dr. (General  DeGaulle - Berkley Dr) City Funded Bid & Award C Old Aurora $2,032,260.00 Q1 2015 Q3 2015 Reconstruction of existing roadway, including the replacement of affected  utilities.
DPW404 Hurricane Isaac Repairs City Funded Complete ABCDE City Wide $26,232.84 12-Dec-13 A 30-May-14 A The project  will consist of restoring damaged concrete sidewalks, concrete driveways,  barrier curbs, mountable curbs, and surrounding earth displaced by fallen trees  and other disaster related occurrences within the City right of way as a result  of Hurricane Isaac.
DPW430 Idaho St. (Wabash - Gen DeGaulle) CDBG Funded Complete C Tall Timbers - Brechtel $98,583.38 30-Jul-14 A 20-Aug-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW431 Illinois St. (Gen DeGaulle - Amazon) CDBG Funded Complete C Tall Timbers - Brechtel $56,082.13 29-Jul-14 A 20-Aug-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW452 Indiana St. (General DeGaulle - Amazon) CDBG Funded Planning C Tall Timbers - Brechtel $100,000.00 Q1 2015 Q2 2015 This project will accomplish the rehabilitation of  asphalt pavement including, milling, full depth patching and 2-inch overlay,  clearing and sealing of joints and curb repair.  Additional improvements  may include features to improve access for all users such as sidewalk repair, construction of ADA ramps,  installation of high-visibility crosswalks and other roadway striping, and  installation of new way finding and other street  signage.
DPW315 International School of LA - Safe Routes to School State ID 737-99-1024 City Funded Bid & Award B Lower Garden District $259,624.00 Q1 2015 Q2 2015 Construct curb extensions with ADA compliant ramps at  various locations, install countdown pedestrian signals, pavement markings for  crosswalks at various locations, and miscellaneous markings and signs all in the  immediate vicinity of the International School of LA.  State Project No.  737-36-0019.
DPW456 Isaac Drainage Point Repairs CDBG Funded Planning ABCDE City Wide $5,100,000.00 Q1 2016 Q4 2016 The intent of this project is to improve drainage  conditions throughout the City of New Orleans.     Based on  311 calls, various other complaints received by DPW, and pre-existing known  issues after Hurricane Isaac, the scope of work includes, but not limited to,  the following:  cleaning of existing catch basins and drain lines,  installation of new drain lines, catch basins, manholes, and  point repairs to existing drain lines.  Pavement and/or sidewalk  repairs may be necessary above new drain line  installations.
DPW090 Jackson Ave (Claiborne Ave - Galvez St) City Funded Bid & Award B Central City $3,842,008.00 Q4 2015 Q1 2016 Reconstruction of existing roadway,  including the replacement of affected utilities
DPW442 Jackson Ave. (S. Claiborne - Tchoupitoulas) CDBG Funded Design B Central City, Lower Garden District, St. Thomas Dev $3,750,000.00 Q4 2015 Q3 2016 Scope of work includes 2" mill and overlay, some full depth patches, installation of ADA complaint curb ramps, sidewalks, and new striping.
DPW283 Jefferson Ave. (Claiborne - Tchoupitoulas ) Bikeway City Funded Design A Audubon $12,750.00 Q4 2018 Q1 2019 Install new pavement markings and  signage
DPW407 Jefferson Davis Bike Path (Gravier St. - Orleans Ave.) City Funded Construction BD Tulane Gravier, Treme-Lafitte $111,550.00 27-Jan-15 A Q1 2015 Work will include replacement of concrete panels, and reconstruction of ramps, including removal of the existing ramp blocks and installation of ADA-compliant detectable warnings.  Other improvements include re-grading the ground adjacent the trail, and replacement of failing sidewalks connecting to the path.
DPW092 Johnson St (Jefferson - Claiborne), Melodia (Claiborne - S. Johnson) City Funded Bid & Award A Audubon $3,002,268.40 Q4 2015 Q3 2016 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW094 Lafitte Greenway Bicycle/Pedestrian Path - (N. Alexander- Basin) CDBG Funded Construction ACD Treme - Lafitte $9,195,631.00 20-Mar-14 A Q3 2015 Includes sidewalk and pedestrian  walkway improvements, bikeways, traffic and pedestrian signage, landscaping,  lighting, and public art.
DPW432 Laharpe St. (St. Bernard Ave - N. Claiborne) CDBG Funded Complete D Seventh Ward $77,149.88 08-Aug-14 A 29-Aug-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW097 Lake Forest Ave. Traffic Improvements  (Lake Forest at Bullard) City Funded Planning E New Orleans East $151,050.00 Q1 2016 Q2 2016 Roundabout Evaluation
DPW096 Lake Forest Blvd. Widening (Eastover Dr - I-510) City Funded Design E Read Blvd East $2,202,360.00 Q3 2015 Q3 2016 Widening of existing roadway,  including the replacement of affected utilities.
DPW098 Lakefront/Holy Cross Traffic Signals City Funded Complete A Holy Cross $3,415,290.30 17-Jan-12 A 08-Mar-13 A Traffic signal  improvements
DPW428 Lamarque (LB Landry - Sumner) CDBG Funded Complete C Whitney $207,688.25 04-Aug-14 A 29-Aug-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW100 LaSalle St (Poydras - Tulane Ave US 61) PTP Complete B Uptown $741,349.00 03-Nov-09 A 04-Dec-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, removal & replacement of  sidewalks, installation of trees, ADA ramps, bike lane striping &  signage.
DPW101 LeBoeuf (Patterson - Opelousas), Sumner (Newton - Opelousas), Slidell (Whitney - Sumner) City Funded Complete C U.S. Naval Base $4,648,674.00 07-Feb-11 A 22-Dec-11 A Reconstruction of existing roadway, including the  replacement of affected utilities.
DPW447 LED Street Lighting Energy Smart Funding Construction ABCDE City Wide $14,600,000.00 30-Jun-14 A Q2 2015 Conversion of old streetlights into new LED street lights throughout the  city.
DPW102 Leon C. Simon Dr (London Canal - Elysian Fields Ave) PTP Complete D Lake Terrace and Oaks $1,208,379.00 20-Nov-09 A 18-Apr-11 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of ADA ramps,  bike lane striping & signage.
DPW360 Leonidas St. (Palmetto - Earhart) PTP Complete A Hollygrove $426,936.00 17-Apr-13 A 22-Aug-13 A Removal  and replacement of the sidewalk intersections for the installation of the  compliant ADA ramps and the installation of the ADA ramps in the  medians.
DPW451 Louisa/Higgins Intersection CDBG Funded Planning D Desire Area $400,000.00 Q1 2015 Q1 2015 This project will accomplish the  rehabilitation of concrete pavement including panel patching/replacement,  cleaning and sealing of joints, crack sealing, curb repair, and  reconstruction/adjustment to existing catch basins and manholes.   Additional improvements may include features to improve access for all users  such as sidewalk repair, construction of ADA ramps, installation of  high-visibility crosswalk and other roadway striping, and installation of new  way finding and other street signage.
DPW282 Louisiana Ave ( St. Charles - Magazine) Bikeway City Funded Design B Touro $14,000.00 Q4 2019 Q4 2019 Install new pavement markings and  signage
DPW292 Lower Ninth Ward Pilot Streets - Make It Right City Funded Complete E Lower Ninth Ward $3,070,608.00 11-Jun-12 A 24-Sep-12 A Reconstruction of existing roadway, including  the replacement of affected utilities.Streets include Deslonde St from N.  Derbigny to N. Prieur St., N. Derbigny St. from Deslonde St. to Reynes St., N.  Prieur St. from Deslonde St. to Reynes St., Tennessee St. from Derbigny St. to Reynes St. (Sidewalks and driveway  aprons only).
DPW106 Lower Ninth Ward Streetscape Phase I (N. Claiborne - Andry to Lamanche)(St. Claude-Bridge to Egania) CDBG Funded Complete E Lower Ninth Ward $1,244,251.95 01-Jun-12 A 18-Nov-12 A An enhancement project that may include: Sidewalk  and ADA-compliant curb ramps, landscaping, lighting, public art space,  and minor utility modifications and improvements.
DPW393 Lower Ninth Ward Streetscape Phase II (N. Claiborne -  Lamanche - Tennessee) CDBG Funded Bid & Award E Lower Ninth Ward $655,748.05 Q2 2015 Q3 2015 An enhancement project that may include: Sidewalk  and ADA-compliant curb ramps, landscaping, lighting, public art space,  and minor utility modifications and improvements.
DPW108 Loyola Ave. (Canal St. - US 90) PTP Complete B Central Business District $3,584,539.00 03-Nov-09 A 04-Dec-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, removal & replacement of  sidewalks, installation of trees, ADA ramps, bike lane striping &  signage.
DPW399 MacArthur Blvd (Gen DeGaulle - Kabel) PTP Construction C Old Aurora $1,312,211.73 12-Jan-15 A Q2 2015 Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW113 Magazine St. (Canal - US 90) PTP Complete B Central Business District $1,066,407.00 03-Nov-09 A 25-Aug-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, removal & replacement of  sidewalks, installation of trees, ADA ramps, bike lane striping &  signage.
DPW110 Magazine St. (St. Joseph St - Calliope St) City Funded Complete B Central Business District $4,938,363.00 29-Jun-09 A 13-May-10 A Sidewalk and landscaping  improvements
DPW114 Magazine St. (US 90B - Nashville) PTP Complete AB Uptown $3,373,617.00 04-Jan-11 A 10-Nov-11 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of ADA ramps  including  street names and bikelane striping & signage, removal &  replacement of sidewalks.
DPW112 Magazine St. Phase I (Nashville Ave - Calhoun St) City Funded Design A Audubon $5,936,335.00 Q4 2015 Q4 2016 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW111 Magazine St. Phase II (Calhoun - Leake Ave) City Funded Design A Audubon $9,893,912.00 Q3 2016 Q2 2017 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW391 Magnolia Converted Ped Bridge City Funded Design A Bayou St. John $954,400.00 Q4 2015 Q1 2016 Bridge reconstruction
DPW419 Magnolia Market Place Streetscape (Willow, Toledano, Claiborne) CDBG Funded Bid & Award B Central City $110,000.00 Q1 2015 Q2 2015 An enhancement project that may  include: Sidewalk and ADA-compliant curb ramps, landscaping, lighting, public  art space, and minor utility modifications and improvements.
DPW249 Marconi Blvd. (Robert E. Lee - Norfolk Southern Railroad) Bikeways City Funded Complete AC City Park $24,750.00 08-Dec-09 A 16-Jun-10 A Install new pavement markings and  signage
DPW118 Martin Bridge over Morrison City Funded Complete E Little Woods $1,188,700.00 02-Nov-11 A 28-Jun-12 A Bridge  reconstruction
DPW263 Martin Luther King  Blvd ( Claiborne Ave - Broad St ) Bikeway City Funded Complete B B. W. Cooper $24,850.00 22-Aug-13 A 21-Oct-13 A Install new pavement markings and  signage
DPW395 Martin Luther King Blvd (Washington - Earhart) Bikeway City Funded Complete B Gert Town $4,000.00 22-Aug-13 A 17-Dec-13 A Install new pavement markings and  signage
DPW346 Mayo Rd. (Hayne - Morrison) PTP Complete E Little Woods $601,198.00 16-Jul-12 A 01-Nov-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW347 Mayo Rd. (Morrison - I-10) PTP Complete E Little Woods $360,719.00 03-Aug-12 A 01-Nov-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW397 Mercedes St (MacArthur - Herschel) PTP Complete C Behrman $232,000.00 08-Apr-14 A 27-Jun-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW120 Michoud Blvd (Chef Menteur Blvd - Dwyer Rd) City Funded Bid & Award E Village de Lest $3,782,476.00 Q4 2015 Q3 2016 Removal of existing roadways and replace with  new hot mix asphalt roadways including new concrete curb and gutter bottom,  rehabilitation of water and drain lines, constructing driveways, sidewalks and  handicap ramps, and all work incidental to the project as shown on the plans or  as directed by the Engineer in the field.
DPW142 Michoud Front Door Infrastructure Improvements (Old Gentilly Road from I-510 - Chef Menteur Highway) CDBG Funded Construction E Viavant $6,253,798.00 13-Oct-14 A Q1 2015 An enhancement project that may  include: Construction of both new asphalt, and concrete roadways and appropriate  striping, repair of existing roadways, landscaping, install and improved  lighting, improved drainage, and intersection improvements at  Chef Menteur and Almonaster Blvd.
DPW128 Mirabeau Ave (Bayou St. John - Elysian Fields Ave) PTP Complete D Filmore $2,950,864.00 20-Nov-09 A 02-May-11 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, removal & replacement of  sidewalk, installation of ADA ramps, bike lane striping &  signage.
DPW277 Miro St ( Elysian Fields Ave - Orleans Ave) Bikeway City Funded Complete D Seventh Ward $24,450.00 22-Aug-13 A 15-Oct-13 A Install new pavement markings and  signage
DPW129 Miro St (Elysian Fields Ave - Orleans Ave) PTP Complete ACD Mid-City $978,426.00 04-Jan-10 A 16-Jun-11 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of ADA  ramps.
DPW345 Morrison Rd. (Lamb - Mayo) PTP Complete E Little Woods $961,917.00 16-Jul-12 A 01-Nov-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW373 N Peters St. (Canal - St Louis) PTP Complete C French Quarter $1,200,219.00 23-Jul-12 A 31-Dec-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW067 N. Galvez  St (Elysian Fields Ave  - Almonaster Ave ) City Funded Bid & Award CD St. Roch $6,751,425.00 Q1 2015 Q1 2016 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW289 N. Galvez (Orleans Ave. - Poydras) PTP Complete AB Mid-City $3,309,167.00 04-Jan-10 A 16-Jun-11 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable  installation of ADA  ramps.
DPW130 N. Galvez St (Tennessee St  - Delery St) City Funded Bid & Award E Lower Ninth Ward $10,806,000.00 Q2 2015 Q2 2016 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW435 N. Robertson (Esplanade Ave. - St Bernard Ave) CDBG Funded Complete D Seventh Ward $191,070.00 21-Jul-14 A 27-Aug-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW433 N. Villiere St. (Esplanade Ave. - Annette) CDBG Funded Complete D Seventh Ward $196,418.75 28-Jul-14 A 27-Aug-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW238 Napoleon, Broad and Fontainebleau Intersection Design CDBG Funded Complete B Broadmoor $250,000.00 #N/A 07-Aug-12 A May include sidewalk or other  pedestrian walkway improvements, bikeways, traffic and pedestrian signage or  signalization, landscaping, lighting, or public art.
DPW290 Napoleon-Freret Roadway Improvements (Clara St. (Napoleon - Cadiz), Jena (Clara - S. Claiborne)) CDBG Funded Complete B Freret $855,300.00 11-Feb-11 A 14-Oct-11 A Improvements to various minor streets,  which may include reconstruction and/or milling and overlay.
DPW284 Nashville Ave (Caliborne US 90 - Tchoupitoulas) Bikeway City Funded Complete A Audubon $14,250.00 22-Aug-13 A 04-Nov-13 A Install new pavement markings and  signage
DPW131 Nashville Ave (Claiborne US 90 - Magazine St ) (Magazine St - Tchoupitoulas St) PTP Complete A Uptown $5,429,536.00 09-Nov-09 A 16-Dec-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, removal & relpacement of  sidewalks &  installation of ADA ramps.
DPW358 Nashville Ave. (S.Claiborne - Fountainbleau) PTP Complete A Marlyville & Fontainbleau $622,132.00 23-Aug-13 A 06-Nov-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW279 Navarre Ave ( Canal Blvd - Marconi Dr) Bikeway City Funded Complete A City Park $7,200.00 22-Aug-13 A 21-Oct-13 A Install new pavement markings and  signage
DPW132 Navarre Ave. (Canal Blvd. - Marconi Dr) PTP Complete A Lakeview $808,592.00 04-Jan-10 A 16-Nov-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of ADA  ramps.
DPW239 New Orleans East Streetscape Improvements (Read Blvd, Lakeforest Blvd, Crowder Rd) CDBG Funded Complete E New Orleans East $2,900,000.00 19-Apr-12 A 14-Jun-13 A An enhancement project that may  include: New sidewalks along Lake Forest Blvd, with access to the New Orleans  East Regional Library and Joe Brown Park, new seating and trach receptacles at a  small park at the corner of Lake Forest and Wright Rd, installing a new walking  path on Lake Forest Blvd from Wright Rd to Read Blvd, Adding about 140  additional lights and more that 30 new trees,  and developing a dedicated bike lane on Read Blvd,  Crowder Blvd and Lake Forest Blvd.
DPW137 New Orleans Museum District Enhancement City Funded Complete B Central Business District $334,385.00 07-Jan-14 A 21-Aug-14 A An enhancement project that may  include: Removal and replacement of concrete curbs, walkways, gutters, and  driveways, installation of new brick sidewalks, removal and replacement of  asphalt pavement, adjustment of manholes, catch basins and in-ground utility bases, installation of new ADA-compliant  ramps at corners, planting new plants. trees and tree  grates.
DPW390 Newton St (Whitney - Behrman) PTP Complete C Whitney $1,059,700.00 18-Aug-14 A 05-Dec-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW387 Newton St (Whitney - Teche) PTP Complete C Whitney $913,200.00 08-Apr-14 A 27-Jun-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW402 North Galvez (Orleans - Elysian Fields Ave) PTP Complete D Seventh Ward $2,777,300.00 16-Jun-14 A 29-Sep-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW093 Octavia (Freret - Claiborne) City Funded Bid & Award A Audubon $4,503,402.60 Q4 2015 Q3 2016 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW144 Old Spanish Trail (Nighthart St - Sherwood Dr) City Funded Bid & Award E Read Blvd East $2,927,616.00 Q2 2016 Q3 2016 Reconstruction of existing roadway, including the replacement of affected  utilities.
DPW415 Oleander St. (Short - Burdette) CDBG Funded Complete A Gert Town $96,955.00 08-Aug-14 A 13-Sep-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW322 Opelousas Street Extension (Behrman Avenue to O'Bannon St.) City Funded Complete C Algiers Point $2,180,232.00 11-Feb-11 A 27-Jun-11 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable.
DPW140 Oretha Castle Haley Blvd Streetscape (St. Andrew St. - Calliope St.) CDBG Funded Design B Central City $965,000.00 Q2 2015 Q1 2016 An enhancement project that may  include: Removal of the median between Felicity St and Martin Luther King Blvd,  larger pedestrian crossings/medians at intersections, installation of new  ADA-compliant ramp curbs, repairs to damaged sidewalks, conversion of the  roadway from two travel lanes  and parking lane into a parking lane, bicycle lane  and travel lane in each direction.
DPW145 Orleans Ave. (N. Claiborne Ave - City Park Ave.) PTP Complete A Mid-City $4,437,504.00 04-Jan-10 A 01-Oct-11 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of ADA  ramps.
DPW414 Orpheus Ct. (S. Carrollton Ave. - Short) CDBG Funded Complete A Gert Town $18,570.00 11-Aug-14 A 15-Sep-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW388 Pace Blvd (Gen Meyer Ave - Wall Blvd) PTP Complete C Behrman $1,305,000.00 08-Apr-14 A 27-Jun-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW147 Paris Ave. (I-610 - Mirabeau Ave) PTP Complete D St. Bernard Area $742,125.00 20-Nov-09 A 16-Apr-12 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, Concrete panel replacement,  removal & replacement of sidewalks, installation of ADA ramps, bike lane  striping & signage.
DPW150 Park Island Bridge over Bayou St. John City Funded Complete AD Filmore $2,085,853.00 08-Dec-09 A 01-Jun-11 A Bridge  reconstruction
PWF006 Patching Repairs - City Park FEMA Phase I Complete A City Park $366,217.00 17-May-10 A 22-Nov-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF013 Patching Repairs - Filmore FEMA Phase I Complete D Filmore $2,181,931.00 15-Feb-10 A 03-Aug-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF018 Patching Repairs - Gentilly Woods FEMA Phase I Complete D Gentilly Woods $521,674.00 06-Jul-10 A 10-Sep-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF023 Patching Repairs - Lake Terrace & Oaks FEMA Phase I Complete D Lake Terrace and Oaks $746,569.00 30-Aug-10 A 15-Dec-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF024 Patching Repairs - Lakeshore - Lake Vista FEMA Phase I Complete D Lakeshore-LakeVista $957,181.00 15-Mar-10 A 27-Aug-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF025 Patching Repairs - Lakeview FEMA Phase I Complete A Lakeview $7,532,380.00 14-Apr-09 A 22-Jul-10 A Patching repairs of streets and sidewalks damaged by storm waters and debris  removal.
PWF026 Patching Repairs - Lakewood FEMA Phase I Complete A Lakewood $587,728.00 17-Aug-09 A 03-Jun-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF030 Patching Repairs - Lower Ninth Ward FEMA Phase I Complete E Lower Ninth Ward $2,846,167.00 23-Mar-09 A 04-Feb-11 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF032 Patching Repairs - Marlyville & Fontainebleau FEMA Phase I Complete AB Marlyville & Fontainbleau $3,549,801.00 14-Jun-10 A 10-Dec-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF034 Patching Repairs - Milan & Touro Neighborhoods FEMA Phase I Complete B Milan & Touro Neighborhoods $693,338.00 05-Apr-10 A 15-Jul-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF035 Patching Repairs - Milneburg FEMA Phase I Complete D Milneburg $3,926,742.00 02-Oct-09 A 23-Jul-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF036 Patching Repairs - Navarre FEMA Phase I Complete A Navarre $870,164.00 23-Aug-10 A 07-Jan-11 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF039 Patching Repairs - Pines Village FEMA Phase I Complete D Pines Village $925,794.00 26-Apr-10 A 20-Jul-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF043 Patching Repairs - Read Blvd West FEMA Phase I Complete E Read Blvd West $2,235,635.00 03-Aug-09 A 12-May-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF049 Patching Repairs - Treme - Lafitte FEMA Phase I Complete CD Treme - Lafitte $2,784,704.00 01-Dec-09 A 17-May-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF051 Patching Repairs - Uptown & West Riverside FEMA Phase I Complete AB Uptown & West Riverside $1,048,260.00 02-Nov-09 A 06-May-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
PWF053 Patching Repairs - West End FEMA Phase I Complete A West End $1,789,466.00 26-Oct-09 A 10-Dec-10 A Patching repairs of streets and  sidewalks damaged by storm waters and debris removal.
DPW323 Patterson Drive Extension Phase 1 (Hendee St. to Heerman St) City Funded Complete C Old Aurora $1,052,202.00 03-Dec-12 A 13-May-13 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable.
DPW380 Patterson Drive Extension Phase 2 Heerman St to O'Bannon St.) City Funded Complete C Old Aurora $550,000.00 15-Sep-14 A 14-Nov-14 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable.
DPW501 Pavement Condition Survey Analysis City Funded Construction ABCDE City Wide $555,725.00 08-Dec-14 A Q3 2015 A comprehensive assessment of City-owned streets. Results of the assessment will be used to calculate each roadway’s “Pavement Condition Index” score. The City will use the score to help prioritize future infrastructure improvements.
DPW158 Poydras St (Carondelet St - Camp St) PTP Complete B Central Business District $129,243.00 03-Nov-09 A 25-Aug-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, lakebound, Camp- St Charles  only.
DPW159 Poydras St (LaSalle St  - Loyola Ave) PTP Complete B Central Business District $106,042.00 03-Nov-09 A 25-Aug-10 A Installation of compliant ADA ramps, Bike lane striping  & signage.
DPW255 Press Dr( US 90 - Robert E Lee Blvd ) Bikeway City Funded Complete D Gentilly Woods $20,400.00 08-Dec-09 A 16-Jun-10 A Install new pavement markings and  signage
DPW233 Press Drive Streetscape  (Chef - Leon C Simon) CDBG Funded Complete D Pontchartrain Park $245,996.00 19-Apr-12 A 17-Dec-13 A An enhancement project that may include: Planting more  than 250 trees and over 533 shrubs on the median from Chef Menteur Hwy to Leon  C. Simon Blvd, installing neighborhood signage at Press Dr, as well as signs  denoting the Gentilly Woods and Pontchartrain Park Neighborhoods.
PWF159 Recovery Program - Algiers (West Bank Projects) FEMA Phase II Design C West Bank Neighborhoods $5,432,735.40 Q3 2015 Q3 2016 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF128 Recovery Program - Audubon, Black Pearl, East Carrollton, Uptown, West Riverside FEMA Phase II Design AB Audubon, Black Pearl, East Carrollton, Uptown, West Riverside $16,911,661.67 Q4 2019 Q4 2020 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF138 Recovery Program - B.W. Cooper, Gert Town, Dixon FEMA Phase II Design AB Gert Town/B. W. Cooper, Dixon $11,452,227.92 Q4 2019 Q4 2020 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF140 Recovery Program - Bayou St. John/Fairgrounds, Seventh Ward - SWB FEMA Phase II Design AD Fairgrounds/Bayou St. John, Seventh Ward $10,105,121.70 Q3 2019 Q1 2020 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF100 Recovery Program - Broadmoor FEMA Phase II Design AB Broadmoor $8,576,118.04 Q3 2016 Q3 2017 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF120 Recovery Program - Bywater/Marigny FEMA Phase II Design C Marigny & Bywater Neighborhoods $1,134,153.42 Q2 2019 Q2 2020 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF139 Recovery Program - Central City FEMA Phase II Design B Central City $11,219,479.91 Q1 2019 Q1 2020 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF126 Recovery Program - City Park FEMA Phase II Design A City Park $990,798.27 Q3 2016 Q4 2016 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF123 Recovery Program - Dillard FEMA Phase II Design D Dillard $4,301,579.79 Q2 2016 Q2 2017 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF141 Recovery Program - East Riverside, Garden District, Irish Channel, St. Thomas Dev FEMA Phase II Design B East Riverside, Garden District, Irish Channel, St Thomas Dev $2,918,450.65 Q4 2016 Q4 2017 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF112 Recovery Program - Filmore Quadrant 1 FEMA Phase II Design D Filmore $11,053,269.97 Q2 2016 Q2 2017 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF113 Recovery Program - Filmore Quadrant 2 FEMA Phase II Design D Filmore $7,877,114.63 Q1 2016 Q1 2017 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF119 Recovery Program - Florida Area/Florida Development FEMA Phase II Design D Florida Area/Fischer Dev./Florida Dev. $6,523,347.15 Q2 2017 Q2 2018 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF127 Recovery Program - Freret - SWB FEMA Phase II Design B Freret $1,979,301.08 Q1 2016 Q1 2017 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF136 Recovery Program - Gentilly Terrace and Desire Area Development FEMA Phase II Design D Gentilly Terrace and Desire Area $10,823,553.00 Q2 2016 Q1 2017 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF173 Recovery Program - Gentilly Terrace and Desire Pavement Only FEMA Phase II Design D Gentilly Terrace and Desire Area $9,645,923.19 Q2 2015 Q2 2016 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF133 Recovery Program - Gentilly Woods FEMA Phase II Design D Gentilly Woods $3,916,872.31 Q1 2016 Q1 2017 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF143 Recovery Program - Hollygrove and Leonidas FEMA Phase II Design A Hollygrove and Leonidas $16,501,274.28 Q4 2019 Q4 2020 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF129 Recovery Program - Holy Cross - Part 1 FEMA Phase II Construction E Holy Cross $1,284,385.17 20-Oct-14 A Q1 2015 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF170 Recovery Program - Holy Cross - Part 2 FEMA Phase II Construction E Holy Cross $597,883.73 12-Jan-15 A Q2 2015 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF131 Recovery Program - Iberville/ Tulane Gravier - SWB FEMA Phase II Design BC Tulane/Gravier/Iberville Neighborhoods $4,994,363.22 Q2 2019 Q2 2020 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF125 Recovery Program - Lake Terrace & Oaks - SWB FEMA Phase II Design D Lake Terrace and Oaks $7,716,335.79 Q1 2016 Q1 2017 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF168 Recovery Program - Lake Vista FEMA Phase II Design D Lakeshore-LakeVista $9,840,873.67 Q3 2015 Q3 2016 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF107 Recovery Program - Lakeshore FEMA Phase II Design D Lakeshore-LakeVista $5,554,610.55 Q3 2015 Q3 2016 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF172 Recovery Program - Lakeview (Paving Only Quad 1) FEMA Phase II Construction A Lakeview $3,012,377.49 26-Jan-15 A Q3 2015 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF174 Recovery Program - Lakeview (Paving Only Quad 2) FEMA Phase II Design A Lakeview $6,607,919.98 Q2 2015 Q2 2016 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF102 Recovery Program - Lakeview - Vicksburg St. Demonstration FEMA Phase II Complete A Lakeview $250,000.00 01-Oct-12 A 03-Dec-12 A Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF103 Recovery Program - Lakeview Quadrant 1 FEMA Phase II Design A Lakeview $7,046,069.39 Q4 2015 Q4 2016 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF104 Recovery Program - Lakeview Quadrant 2 FEMA Phase II Design A Lakeview $9,688,112.00 Q1 2016 Q1 2017 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF108 Recovery Program - Lakewood - SWB FEMA Phase II Design A Lakewood $4,333,659.35 Q3 2015 Q1 2016 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF115 Recovery Program - Little Woods - SWB FEMA Phase II Design DE Little Woods $3,826,101.62 Q3 2018 Q3 2019 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF156 Recovery Program - Lizardi St FEMA Phase II Complete E Lower Ninth Ward $727,058.94 08-Apr-13 A 17-Jun-13 A Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF106 Recovery Program - Lower Garden District/CBD - SWB FEMA Phase II Design BC Lower Garden District/Central Business District $1,367,175.60 Q1 2016 Q1 2017 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF096 Recovery Program - Lower Ninth Ward (Pavement Only - Quad 1) FEMA Phase II Design E Lower Ninth Ward $1,894,777.20 Q2 2015 Q2 2016 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF157 Recovery Program - Lower Ninth Ward (Pavement Only - Quad 2) FEMA Phase II Bid & Award E Lower Ninth Ward $7,069,486.34 Q1 2015 Q2 2016 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF171 Recovery Program - Lower Ninth Ward (Pavement Only - Quad 3) FEMA Phase II Design E Lower Ninth Ward $4,300,704.86 Q2 2015 Q2 2016 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF080 Recovery Program - Lower Ninth Ward Phase II (Deslonde and Flood) FEMA Phase II Complete E Lower Ninth Ward $4,421,392.26 25-Mar-13 A 25-Mar-14 A Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF093 Recovery Program - Lower Ninth Ward Quadrant 1 FEMA Phase II Design E Lower Ninth Ward $9,873,097.80 Q1 2017 Q1 2018 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF094 Recovery Program - Lower Ninth Ward Quadrant 2 FEMA Phase II Design E Lower Ninth Ward $14,354,376.07 Q2 2016 Q2 2017 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF095 Recovery Program - Lower Ninth Ward Quadrant 3 FEMA Phase II Design E Lower Ninth Ward $11,123,014.25 Q2 2016 Q2 2017 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF148 Recovery Program - Marlyville-Fontainebleau FEMA Phase II Design AB Marlyville & Fontainbleau $12,775,155.70 Q3 2019 Q3 2020 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF117 Recovery Program - Mid City FEMA Phase II Design AB Mid-City $7,913,401.67 Q3 2019 Q3 2020 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF175 Recovery Program - Mid City Paving Only FEMA Phase II Design AB Mid-City $5,112,553.03 Q3 2015 Q3 2016 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF167 Recovery Program - Milan FEMA Phase II Design B Milan $2,495,312.66 Q3 2015 Q3 2016 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF101 Recovery Program - Milneburg - SWB FEMA Phase II Design D Milneburg $5,559,433.00 Q4 2015 Q4 2016 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF114 Recovery Program - Navarre - SWB FEMA Phase II Design A Navarre $2,100,272.16 Q4 2015 Q3 2016 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF135 Recovery Program - Pines Village FEMA Phase II Design D Pines Village $6,344,249.58 Q2 2018 Q2 2019 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF110 Recovery Program - Plum Orchard FEMA Phase II Design E Plum Orchard $7,942,921.96 Q2 2017 Q2 2018 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF109 Recovery Program - Pontchartrain Park FEMA Phase II Design D Pontchartrain Park $11,139,896.03 Q1 2016 Q1 2017 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF105 Recovery Program - Read Blvd East FEMA Phase II Design E Read Blvd East $15,396,861.59 Q2 2018 Q2 2019 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF134 Recovery Program - Read Blvd West FEMA Phase II Design E Read Blvd West $7,628,905.08 Q3 2017 Q3 2018 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF121 Recovery Program - St. Anthony Quadrant 1 FEMA Phase II Design D St. Anthony $11,145,027.17 Q4 2015 Q3 2016 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF122 Recovery Program - St. Anthony Quadrant 2 FEMA Phase II Design D St. Anthony $7,954,596.74 Q2 2016 Q2 2017 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF124 Recovery Program - St. Bernard - SWB FEMA Phase II Design D St. Bernard Area $2,070,351.34 Q4 2015 Q1 2016 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF099 Recovery Program - St. Claude (Paving Only) FEMA Phase II Design CD St. Claude $6,384,635.30 Q2 2015 Q2 2016 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF082 Recovery Program - St. Claude Phase II Group 1 FEMA Phase II Construction CD St. Claude $3,256,077.64 24-Feb-14 A Q1 2015 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF097 Recovery Program - St. Claude Quadrant 1 FEMA Phase II Design CD St. Claude $6,095,057.65 Q1 2017 Q1 2018 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF158 Recovery Program - St. Claude Quadrant 1- Feliciana St FEMA Phase II Complete CD St. Claude $182,436.25 04-Mar-13 A 23-May-13 A Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF098 Recovery Program - St. Claude Quadrant 2 FEMA Phase II Design CD St. Claude $6,828,469.88 Q1 2017 Q1 2018 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF111 Recovery Program - St. Roch - SWB FEMA Phase II Design CD St. Roch $13,895,684.02 Q4 2017 Q4 2018 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF118 Recovery Program - Touro FEMA Phase II Construction B Touro $741,804.08 08-Dec-14 A Q1 2015 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF150 Recovery Program - Treme - Lafitte FEMA Phase II Design CD Treme - Lafitte $5,641,821.05 Q2 2019 Q2 2020 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF155 Recovery Program - Venetian Isles FEMA Phase II Construction E Venetian Isles $712,179.42 07-Jul-14 A Q1 2015 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF166 Recovery Program - Viavant / Lake Catherine - SWB FEMA Phase II Design E Viavant, Lake Catherine, Venetian Isles $5,139,699.72 Q2 2018 Q2 2019 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF169 Recovery Program - Village De L'Est FEMA Phase II Design E Village de Lest $8,072,882.91 Q4 2017 Q4 2018 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF116 Recovery Program - West End FEMA Phase II Design A West End $14,112,775.04 Q1 2016 Q1 2017 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
PWF149 Recovery Program - West Lake Forest FEMA Phase II Design E West Lake Forest $846,054.58 Q2 2017 Q2 2018 Repair  Hurricane Katrina related infrastructure damage. May include total or partial  replacement of utilities,  sidewalks, American with Disabilities Act-compliant curb ramps, driveway aprons,  curbs and road paving. Visit RecoveryRoads.nola.gov for additional  detail.
DPW320 Reinventing the Crescent Infrastructure Imp. N Peters(St Philip-St Ferdinand)Chartres(Piety-Gallier) City Funded Complete C Marigny & Bywater Neighborhoods $816,508.00 19-Oct-09 A 03-Jun-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of Sidewalks  & ADA ramps.
DPW437 Reynes St. (St. Claude Ave. - Douglas) CDBG Funded Complete E Holy Cross $146,037.38 12-Aug-14 A 19-Sep-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW254 Robert E Lee Blvd ( St. Bernard Ave- Paris Ave) Bikeway City Funded Complete AD Filmore $13,300.00 13-Jan-14 A 17-Jan-14 A Install new pavement markings and  signage
DPW353 Robert E Lee Blvd. (Elysian Fields - Franklin) PTP Complete D Milneburg $1,036,904.00 17-Jun-13 A 19-Sep-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW317 Robert E. Lee (Paris to Pratt) City Funded Complete A Filmore $3,080,990.00 02-Nov-09 A 05-May-10 A Reconstruction of existing roadway, including the replacement of  affected utilities.
DPW241 Robert E. Lee Blvd (Perlita Dr - Chatham Dr) and Paris Ave. (Robert E. Lee - Aviators) Streetscape CDBG Funded Complete D Filmore $570,000.00 12-Aug-13 A 17-Apr-14 A An enhancement project that may include: Installation of new sidewalks and  driveway aprons, installation of ADA-complaint ramps at sidewalk corners, new  bicycle lane striping, fresh crosswalk and pavement striping, new landscaping  including planting of about 75 trees, new neighborhood signage and lighting, and  improved drainage.
DPW173 Robert E. Lee over London Avenue Canal City Funded Planning AD City Park $1,600,000.00 #N/A #N/A Bridge reconstruction
DPW374 Royal St. (Canal - Esplanade) PTP Complete C French Quarter $1,583,942.00 23-Jul-12 A 31-Dec-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW386 S Peters St (Canal - Calliope St) PTP Complete B Central Business District $1,294,920.00 24-Mar-14 A 17-Oct-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW458 S. Dupre (Canal - Tulane) & Gayoso (Canal - Banks) City Funded Planning B Mid-City $4,968,018.00 Q1 2016 Q3 2016 Installing a new  subsurface storm water collection and conveyance system in a two block region of  Cherokee street for approximately 700 linear feet.
DPW441 S. Galvez St. (Jackson Ave. - Toledano) CDBG Funded Design B Central City $6,000,000.00 Q3 2015 Q2 2016 Full reconstruction of concrete  roadway including all underground utilities. Installation of ADA compliant curb  ramps, new sidewalks, driveways, landscaping, street lights and striping of  crosswalks and a dedicated bike lane.
DPW264 S. Galvez Street ( Earhart- Toledano) Bikeway City Funded Design B Broadmoor $9,300.00 Q2 2015 Q2 2015 Install new pavement markings and  signage
DPW176 S. Jeff. Davis (M. L. King Jr. - Howard) City Funded Complete B Gert Town $1,902,747.00 10-Oct-11 A 30-Mar-12 A Reconstruction of existing roadway, including the  replacement of affected utilities.
DPW362 S. Jefferson Davis Pkwy (Gravier - Canal) PTP Complete B Tulane - Gravier $1,036,904.00 06-Nov-13 A 12-Mar-14 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW406 S. Jefferson Davis Pkwy Bridge Ramp Repairs PTP Complete B Gert Town $325,000.00 12-May-14 A 30-Jul-14 A Removal  and replacement of the sidewalk intersections for the installation of the  compliant ADA ramps and the installation of the ADA ramps in the  medians.
DPW418 S. Tonti St. (Julia - Old Poydras) CDBG Funded Complete B Tulane - Gravier $36,905.00 21-Jul-14 A 14-Aug-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
PWF055 School Zone Flashing Beacons City Funded Complete ABCDE City Wide $1,793,456.00 05-Aug-08 A 29-Nov-10 A Repair and/or replacement of damaged  school zone flashers with new solar-powered flashers
DPW453 Selma St. (Ray Ave. - America/Dead End) CDBG Funded Planning E Plum Orchard $400,000.00 Q1 2015 Q2 2015 This project will accomplish the rehabilitation of  asphalt pavement including, milling, full depth patching and 2-inch overlay,  clearing and sealing of joints and curb repair.  Additional improvements  may include features to improve access for all users such as sidewalk repair, construction of ADA ramps,  installation of high-visibility crosswalks and other roadway striping, and  installation of new way finding and other street  signage.
DPW412 Short (Washington - Palm) CDBG Funded Complete A Gert Town $99,961.25 03-Jul-14 A 25-Jul-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW187 St. Anthony Path Landscape (Mirabeau - Pelopidas) CDBG Funded Complete CD Dillard $609,660.00 14-May-12 A 22-Jan-13 A An enhancement project that may include: Extending the median along St  Anthony Ave from Mirabeau Ave to Pelopidas Ave, widening the median to  accommodate the new walking path, additional planting of trees along the walking  path from Pelopidas Ave to Gentilly Blvd, adding a walking path along St Anthony  Ave from Gentilly Blvd to Interstate 610.
DPW188 St. Bernard Ave Streetscape (N. Claiborne - North Miro St) CDBG Funded Complete CD Seventh Ward $412,268.00 27-May-14 A 27-Oct-14 A May include sidewalk or other  pedestrian walkway improvements, bikeways, traffic and pedestrian signage or  signalization, landscaping, lighting, or public art.
DPW291 St. Bernard Ave. (Filmore Ave. to Robert E. Lee Blvd.) City Funded Bid & Award D Filmore $7,573,700.00 Q2 2015 Q1 2016 Reconstruction of existing roadway, including the replacement of  affected utilities.
DPW189 St. Bernard Ave. (I-610 - Filmore Ave.) PTP Complete D St. Bernard Area $3,228,389.00 20-Nov-09 A 02-May-11 A Rehabilitation of roadway by milling  existing surface and overlay with new asphalt, including pre-milling patching  repairs as well as adjustment of utility manholes, where applicable.
DPW348 St. Bernard Ave. (N. Rampart - Sere) PTP Complete CD Seventh Ward $3,940,205.00 01-Jun-13 A 17-Oct-13 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW184 St. Charles Ave (Calliope St - Louisiana Ave) City Funded Design B Central City $7,010,000.00 Q4 2015 Q4 2016 Rehabilitation of roadway by milling  existing surface and overlay with new asphalt, including pre-milling patching  repairs as well as adjustment of utility manholes, where applicable.
DPW324 St. Charles Ave (Napoleon Ave. - Louisiana Ave) City Funded Design B Milan & Touro Neighborhoods $2,900,000.00 Q4 2016 Q4 2017 Rehabilitation of roadway by milling  existing surface and overlay with new asphalt, including pre-milling patching  repairs as well as adjustment of utility manholes, where applicable.
DPW190 St. Charles Ave (Nashville Ave - S. Carrollton Ave) PTP Complete A Uptown $3,035,595.00 03-Aug-09 A 06-Oct-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of ADA  ramps.
DPW281 St. Charles Ave (Nashville Ave - S. Carrollton) Bikeway City Funded Complete A Audubon $47,950.00 28-Jan-13 A 01-Feb-13 A Install new pavement markings and  signage
DPW330 St. Charles Ave (S. Carrollton - Leake) & S. Carrollton (St Charles - Leake) Roadway Rehabilitation City Funded Complete A Audubon $74,030.00 17-May-10 A 10-Jun-10 A Asphalt  pavement, base repair and curb replacement.
DPW191 St. Charles Ave. (Canal St - US 90) PTP Complete B Central Business District $958,678.00 03-Nov-09 A 10-Dec-11 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of ADA  ramps.
DPW383 St. Charles Ave: Streetscape Improvements Ph 1 (Calliope -Louisiana) City Funded Planning AB City Wide $1,052,631.58 Q1 2016 Q3 2016 May include sidewalk or other pedestrian walkway  improvements, bikeways, traffic and pedestrian signage or signalization,  landscaping, lighting, or public art.
DPW444 St. Claude Drainage Improvements (Montegut, Urqhart, Feliciana, Marias) CDBG Funded Design C St. Claude $1,500,000.00 Q4 2015 Q3 2016 May include subsurface drainage improvements, installation of green infrastructure, 2 inch mill and  overlay and installation of ADA compliant curb ramps.
DPW375 St. Louis St. (Dauphine - Decatur) PTP Complete C French Quarter $449,782.00 23-Jul-12 A 31-Dec-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW370 St. Louis St. (N Rampart - Dauphine) PTP Complete C French Quarter $311,111.00 16-Jul-12 A 31-Dec-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW450 St. Louis St. (N. Claiborne - Broad CDBG Funded Planning D Treme - Lafitte $1,500,000.00 Q2 2015 Q3 2015 This project will accomplish the rehabilitation of  asphalt pavement including, milling, full depth patching and 2-inch overlay,  clearing and sealing of joints and curb repair. Additional improvements may  include features to improve access for all users such as sidewalk repair, construction of ADA ramps,  installation of high-visibility crosswalks and other roadway striping, and  installation of new way finding and other street  signage.
DPW185 St. Roch and St. Claude Roadway Improvements (St. Claude Ave. - N. Roman St.) CDBG Funded Complete CD St. Roch $1,476,000.00 11-Jan-10 A 01-Nov-10 A Rehabilitation of roadway by milling existing surface and  overlay with new asphalt, including pre-milling patching repairs as well as  adjustment of utility manholes, where applicable, installation of ADA ramps  including street name tiles.
DPW326 St. Roch/St.Claude Intersection Revitalization City Funded Complete C St. Roch $210,843.00 31-Jan-13 A 18-Mar-13 A May include sidewalk or other pedestrian walkway  improvements, bikeways, traffic and pedestrian signage or signalization,  landscaping, lighting, or public art.
DPW410 Stroelitz (Joliet - Dublin) CDBG Funded Complete A Gert Town $188,324.13 11-Jul-14 A 31-Jul-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW401 Sullen Pl (Gen DeGaulle - Patterson) PTP Construction C Old Aurora $2,595,700.00 12-Jan-15 A Q2 2015 Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW423 Sumner (Lawrence - Newton) CDBG Funded Complete C Behrman $700,655.85 07-Aug-14 A 03-Sep-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW422 Sumner (Mardi Gras - Lawrence) CDBG Funded Complete C Whitney $105,851.00 13-Oct-14 A 07-Nov-14 A Rehabilitation of concrete pavement  including panel patching/replacements, clearing and sealing of joints, crack  sealing and curb repair. Additional improvements include sidewalk repair,  construction of ADA ramps, installation of high-visibility crosswalks and other  roadway striping.
DPW195 Tchoupitoulas St (Canal St - Calliope St) City Funded Complete B Central Business District $1,299,558.00 20-Mar-12 A 30-Jun-12 A Rehabilitation of roadway by milling  existing surface and overlay with new asphalt, including pre-milling patching  repairs as well as adjustment of utility manholes, where applicable.
DPW376 Toulouse St. (Dauphine - Decatur) PTP Complete C French Quarter $314,017.00 23-Jul-12 A 31-Dec-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW371 Toulouse St. (N Rampart - Dauphine) PTP Complete C French Quarter $315,191.00 16-Jul-12 A 31-Dec-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW196 Tulane Ave and Jeff. Davis Pkwy Streetscape - Baudin St, Clark, and D'hemecourt CDBG Funded Complete B Mid-City $300,000.00 14-May-12 A 11-Nov-12 A May include sidewalk or other  pedestrian walkway improvements, bikeways, traffic and pedestrian signage or  signalization, landscaping, lighting, or public art.
DPW341 Tupelo St. (Douglass St. - St. Claude Ave.) PTP Complete E Lower Ninth Ward $338,763.00 09-Jul-12 A 01-Nov-12 A Remove and  replace existing roadway, install new American  with Disabilities Act-compliant curb ramps. Visit www.pavinglaroads.com for additional  detail.
DPW502 University Lakefront Bicycle Boulevard City Funded Design D Filmore $108,750.00 12-Jan-15 A Q4 2015 Install new pavement markings and signage on Cartier (Filmore -  Burbank), Burbank (Cartier - Paris).
DPW242 Urquhart St. (Elysian Fields Ave - Franklin Ave) City Funded Complete C St. Roch $3,649,673.00 14-Feb-11 A 11-Nov-11 A Reconstruction of existing roadway, including the replacement of affected  utilities.
DPW426 Vespasian Blvd. (Lauradale - Wall Blvd.) CDBG Funded Complete C Behrman $176,640.75 21-Jul-14 A 20-Aug-14 A Rehabilitation of asphalt pavement including mill, patching, and 2-inch  overlay. Additional improvements include sidewalk repair, construction of ADA  ramps, installation of high-visibility crosswalks, and other roadway  striping.
DPW427 Vespasian Blvd. (Wall Blvd. - Cobblestone Ln.) CDBG Funded Complete C Behrman $1,997,536.70 18-Jul-14 A 21-Oct-14 A Rehabilitation of concrete pavement  including panel patching/replacements, clearing and sealing of joints, crack  sealing and curb repair. Additional improvements include sidewalk repair,  construction of ADA ramps, installation of high-visibility crosswalks and other  roadway striping.
DPW296 Veterans Admin. Medical Ctr Infrastructure Improvements (Canal, S Claiborne, Tulane, & S Rocheblave) CDBG Funded Complete B Central Business District $13,447,530.00 06-May-10 A 11-Oct-11 A Reconstruction of existing roadway, including the replacement of  affected utilities.
DPW405 Veterans Administration-LSU Medical Center Infrastructure Improvements CDBG Funded Construction B Tulane - Gravier $7,500,000.00 03-Jun-14 A Q2 2015 An enhancement project that may include: New road striping, improved curbs,  gutters and sidewalks, improvements to drainage and catch basins, installation  of new landscaping and streetlights.
DPW201 Vienna (Corinne - Nighthart) City Funded Bid & Award E Read Blvd East $2,158,260.00 Q3 2015 Q2 2016 Reconstruction of existing roadway,  including the replacement of affected utilities.
DPW455 Wabash (Delaware - Florence) CDBG Funded Planning C Tall Timbers - Brechtel $100,000.00 Q1 2015 Q2 2015 This project will accomplish the rehabilitation of  asphalt pavement including, milling, full depth patching and 2-inch overlay,  clearing and sealing of joints and curb repair.  Additional improvements  may include features to improve access for all users such as sidewalk repair, construction of ADA ramps,  installation of high-visibility crosswalks and other roadway striping, and  installation of new way finding and other street  signage.
DPW265 Washington ( S. Broad - Carrollton Ave) Bikeway City Funded Complete B Broadmoor $36,000.00 22-Aug-13 A 16-Dec-13 A Install new pavement markings and  signage
DPW153 Washington Avenue Pedestrian Crossing (Washington Ave. - Drexel Drive - Xavier) City Funded Construction B Broadmoor $2,995,677.00 01-Dec-14 A Q4 2015 Evaluation of installing a pedestrian  bridge over Washington/Palmetto Canal near Xavier University.
DPW251 Whitney Ave & L.B. Landry (Mardi Gras Blvd - Patterson Dr) Bikeway City Funded Complete C Whitney $14,000.00 22-Aug-13 A 21-Oct-13 A Install new pavement markings and  signage
DPW211 Wisner  Bridge over I-610 City Funded Design A City Park $17,000,000.00 Q3 2015 Q4 2016 Bridge reconstruction
DPW256 Wisner Overlay ( Esplanade Ave - Robert E Lee) Bikeway City Funded Design A City Park $80,300.00 Q4 2015 Q4 2015 Install new pavement markings and  signage
DPW213 Wright Road (Chef Menteur Blvd - Dwyer Rd) City Funded Bid & Award E Read Blvd East $10,457,530.00 Q3 2016 Q4 2017 Removal of existing roadways and replace with new hot mix  asphalt or concrete roadways including new concrete curb and gutter bottom,  rehabilitation of water and drain lines, constructing driveways, sidewalks and  handicap ramps, and all work incidental to the project as shown on the plans or  as directed by the Engineer in the field.
DPW445 Youth Study Streets (Encampment, Senate, Cadillic, Milton St.) CDBG Funded Planning D St. Bernard Area $1,350,000.00 Q1 2016 Q4 2016 May include underground  infrastructure improvements, roadway resurfacing and installation of  ADA compliant curb ramps, sidewalks and driveway aprons near the Youth Study Center.

 

 