The Department of Public Works is currently working with Barriere Construction Co., LLC to improve drainage on Henry Clay Ave. between St. Charles Ave. and Hurst St.

Construction on the $1M project is approximately 15 percent complete and the project scope of work includes:

  • Removing and replacing the top layer of asphalt pavement;
  • Patching damaged base failures;
  • Installing two 15-inch drainage pipes;
  • Installing eight new catch basins;
  • Repairing a damaged drain line on St. Charles Ave. near the intersection of Henry Clay Avenue
  • Installing new Americans with Disabilities Act-compliant curb ramps at appropriate intersections;
  • Making minimal sidewalk, driveway apron and foot lap adjustments; and
  • Installing new high pressure gas lines in concert with this project as opposed to disturbing the neighborhood again, in the future.

  Construction is scheduled to last through the summer.