News & Announcements

June 30, 2017 | From City of New Orleans

Michoud Blvd. reconstruction project underway

The long-awaited Michoud Blvd. reconstruction project is now underway. Crews mobilized to the site in early June and are currently installing a new bus cut through on the Dwyer Rd. neutral ground. The $3.8M reconstruction project includes:

  • Installing a new cut through on Dwyer Rd.;
  • Replacing the existing water, sewer and drainage lines Chef Menteur Hwy. to Dwyer Rd.;
  • Repaving the roadway in concrete between the Michoud Bridge and Dwyer Rd.,
  • Repaving the roadway in asphalt from the Michoud Bridge to Chef Menteur Hwy.; and
  • Installing new sidewalks and ADA-compliant curb ramps at intersections.

The project was designed by Evans-Graves Engineers, Inc. and is being built by Cycle Construction Company, LLC.  Residents who wish to follow this project may write roadwork@nola.gov or call 504-658-ROAD to be added to the project contact list.