MICHOUD BLVD. RECONSTRUCTION PROJECT 22 PERCENT COMPLETE

The Michoud Blvd. Reconstruction Project is approximately 22 percent complete. Last month construction crews installed several new sewer and drainage manholes at the intersection of Lourdes St. and Michoud Blvd.

 

Construction crews are currently installing new drainage and sewer lines in the intersection of Lourdes St. and Michoud Blvd. Work on the sewer main in the neutral ground will resume when construction reaches Dwyer Rd.

 

The $3.8M reconstruction project includes:

 

  • Installing a new bus turnaround on Dwyer Rd.;
  • Replacing the existing water, sewer and drainage lines from Chef Menteur Hwy. to Dwyer Rd.;
  • Repaving the roadway in concrete between the Michoud Bridge and Dwyer Rd.;
  • Repaving the roadway in asphalt from the Michoud Bridge to Chef Menteur Hwy.; and
  • Installing new sidewalks and Americans with Disabilities Act-compliant curb ramps at intersections.

 

The project was designed by Evans-Graves Engineers, Inc. and is being built by Cycle Construction Company, LLC and scheduled to be completed in spring 2018.