The Department of Public Works (DPW) is pleased to announce the completion of the DPW777 Lakeview Alleyway Regrading Northwest Quadrant project. Construction began on June 12, 2025, and will continued through Summer 2026. The project involved regrading work at various alleyway locations throughout the Lakeview area.
Project Locations:
- North Boundary: Allen Toussaint Blvd
- South Boundary: Harrison Ave
- West Boundary: West End Ave
- East Boundary: Canal Blvd
The City of New Orleans Department of Public Works oversaw construction. The typical working hours were 7 AM to 5:30 PM, Monday through Friday. Weekend work occured as needed.
Each stretch of alleyway included in the project is outlined below:
- 7000-6300 West End Blvd / Catina St
- 7000-6300 Wuerpel / Milne Blvd
- 6900-6300 Milne Blvd / Colbert St
- 6900-6300 Colbert St / Louisville St
- 6900-6300 Louisville St / Louis XIV St
- 6900-6300 Louis XIV St / Canal Blvd
Please note: Construction schedules, dates, and durations are subject to change due to rain, equipment breakdown, unforeseen field conditions, existing utility conflicts, or crew availability.
Important Information About Drainage and Alleyway Work
Alleyways are designed to serve as high points, with water intended to flow both toward the cross streets and through each property to the frontage streets, ultimately entering the subsurface drainage system.
The City is currently regrading alleyways to restore them to their original grade, reflecting the standard design levels. We are not modifying or changing the original grades — only restoring the alleyways to their intended elevations to support proper drainage as originally designed.
Project Overview
The Department of Public Works managed the project, with a focus on maintaining local access for residents, deliveries, and emergency services at all times. Safety measures, including traffic control signage, barrels, fencing, and "No Parking/Tow Away Zone" signs, were used to direct drivers and pedestrians around active work areas.
We appreciate the public’s patience and cooperation during construction. These improvements will enhance street conditions, pedestrian access, and underground infrastructure for years to come.