HMGP City Park

This project combines alleyway stormwater storage with lagoon improvements in City Park to increase stormwater storage, improve water quality and enhance green space in City Park. Improved wetlands in City Park accept drainage from Lake Vista.

 

Project Goals

•Operable weirs allow lowering of water levels in lakes in advance of storm events

•Dredged lake beds provide up to 320M gallons of storage capacity diverted from the drainage system

•Modified lake edges stabilize banks and increase storage capacity

•Budget: $22.2M HMGP; Design start: QTR 4 2019